Why operations teams stop trusting the plan.
If the schedule changed three times before Monday, the floor has already decided it is optional.
If the schedule changed three times before Monday, the floor has already decided it is optional.
Sales commits a date. Planning builds a week. Then, sometime on Sunday night, production decides the printout is a suggestion.
I see this in plants of every size. It is not a motivation problem. The floor stopped believing the plan because the plan kept lying to them.
Monday's sequence changed three times before the first setup. A phone call from sales, a shortage, a machine that was "definitely" back. After a few weeks of that, operators stop looking at the board. They ask the supervisor what is actually running.
Material that the plan said was here turns up on Tuesday. Or doesn't. Purchasing can see the PO. Planning cannot. So the job that was locked in on Friday is the one standing still, and the job that was never meant to run is the one with parts.
Then a customer rings. The sequence jumps. Nobody tells the people who already staged the last job. Capacity was a hope, not a number: the schedule assumed a changeover that has not been true for two years.
Friday comes and nobody sits down with what actually shipped. Next week's plan is built on the same fiction.
They build their own list. Usually in Excel. Usually on one person's laptop. The MRP still prints a schedule. Nobody uses it. Dates slip, but the plant looks busy, so the argument starts at dispatch instead of at the Monday meeting where it belonged.
Once that happens, tightening the plan in the system does nothing. The system is not where the work is being decided.
Freeze the sequence for a window the floor can believe, even if it is only two days. Do not jump it without walking onto the floor and saying why. Put material visibility next to the schedule, not in a purchasing folder. Check the rate the line actually runs, not the rate in the routing from 2019.
And close the week. What we said we would make. What we made. What we will not pretend next Monday. That is not a dashboard project. It is how a plan becomes something people will work to.
The schedule changes too often, material shows up the day before the run, sales jumps the sequence, capacity was never real, and nobody comes back on Friday to say what actually shipped. The floor learns to ignore the plan.
Production works around the schedule. Dates slip. You end up running the week from a spreadsheet the MRP knows nothing about.